FIBRE IMPLEMENTATION PROJECTS (Backbone, Metro, FTTH)
Operation and maintenance:Network design, Site survey &planning of network routes. Civil Works to Technical Specification – trenching, ducting, backfilling, Manhole production & planting, special solutions for future damage prevention, etc
Cable Works – blowing, splicing, termination, OTDR testing and Laser source /Power meter test.
Carrying out testing and checking of fiber technical health level as periodically defined by KPI.
Checking optical power level, attenuation, splice loss re-examination at optical joints, testing of both single mode and multimode fiber.
FIBRE BACKBONE MAINTENANCE
- Manhole cleaning, conversion and upgrade.
- Fibre Fault Detection & Restoration
- Relocation of Fibre Infrastructure against foreign threats
- Erosion control
EXPERIENCES IN TELECOMMUNICATION (FIBRE OPTICS)
Anolaj has extensive experience in deploying, testing and auditing Optics Fibre
Telecommunication Infrastructure. Access to key knowledgeable staff is the bane of our continued success.
OUR PAST FIBRE PROJECTS;
MTN Civil installation:
- Deployment of 4km OFC Infrastructures (Civil works), Ondo State under MTNN National Fibre Expand (Phase 3) Scheme, September 2009.
- Deployment of 8km OFC Infrastructures (Civil & Cable works) at Onitsha, Anambra. State under MTNN National Fibre Expand (Phase 4) Scheme, June 2010.
- Deployment of 4.5km OFC Infrastructures (Civil & Cable works) at Onitsha under MTNN National Fibre Expand (Phase 4) Scheme
linking Okey Lane BTS to Enugu-Asaba Backbone
(Splice Point 39), August 2010.
MTN Ofc project:
- Deployment of 20km Civil & OFC Infrastructures (Relocation works) for MTN (Ore – Akure),Ondo State. January 2012.
- Deployment of 18km OFC Infrastructures for Mtn Okun mopo – Saka Tinubu mtn office (WACS cable) March 2012.
Fiber blowing, Splicing and Terminations
Glo Ofc project.
- Deployment of 41.2km OFC Infrastructures for Glo, Darazo – Babaye
August 2011.
- Deployment of 15km civil work & 51km OFC Infrastructures for Glo,
Bauchi – Gombe September 2011.
- Deployment of 40.6km OFC Infrastructures for Glo, Babaye to Potiskum October 2011
- Deployment of 24km OFC Infrastructures for Glo, Matari – Jos
December 2011.
- Deployment of 42km OFC Infrastructures for Glo, Talanta – Mafarawa
June 2012.
- Deployment of 66km OFC Infrastructures for Glo, Kwande – Lafia
May 2013.
- Deployment of 52km OFC Infrastructures for Glo, Jos 804 – Jos 805
June 2013
- Deployment of 73.2km OFC Infrastructures for Glo, Katina
(Kts 005 – Jibia)August 2014
- Deployment of 60.4km OFC Infrastructures for Glo, Jibia – Kts 805
September 2014
- Deployment of 82km OFC Infrastructures for Glo, Kts 805 – Gusau
(Gus 004) December 2014 – ongoing.
ETISALAT (EMTS OFC)
Civil Installation (EMTS)
- Deployment of 15km OFC Infrastructures (Civil works) at Ibadan – Ife, August 2014.
Fiber Installation
- Deployment of 40km OFC Infrastructures for Emts Akure – Owo
October 2014.